Horizontal Directional Drilling (HDD) Installations of Pipeline 28 Inch. Gas Distributions from Gresik to Semarang pipeline Pertamina Gas.The construction of a gas pipeline spanning nearly 300 kilometers takes a long time. especially in areas crossing rivers and railroads, or critical areas.

Leave a Reply

Your email address will not be published. Required fields are marked *